Contact us

If you are interested in cooperation, please contact us immediately, we will give you feedback as soon as possible!


00

Zhitai Plaza

Located in Huangpu District, with a total construction area of ​​approximately 280,000 square meters, the plaza integrates commerce, offices, hotels, and apartments. Utilizing 20 units of 22HP Automotive Cool A main unit from Automotive Multi-Split

View details

01

Daxia Jiangwen Tourist Hall Exhibition Hall, Chun'an, Zhejiang

Located in Chun'an County, Hangzhou, with a total floor area of 25,000 square meters, it is a landmark project of the West Lake-Chun'an Mountain-Sea Collaboration, featuring 56 units of the ORV multi-split system from Outes.

View details

02

Southwest Zhejiang Science and Technology Innovation Park, Lishui City, Zhejiang Province

Located on Plot G-13-02 in Qibaiyang, South City, Lishui, the site is primarily designated for use as an industrial innovation service complex. It is equipped with 81 30-HP heat pump multi-split air conditioning units and 2,138 indoor units.

View details

03

Dacheng Business Center

Located in the heart of the old town of Bishan District, Chongqing, the project covers a total area of 200,000 square meters and is equipped with 22 units of the “Zhiku A” series multi-split heat pump air conditioning systems (ranging from 10 HP to 40 HP), along with 140 medium-static-pressure duct-type indoor units and 8 multi-split fresh air indoor units.

View details

04

Three Gorges University College of Science and Technology (Jiangnan Campus)

Located in Yichang, Hubei, the campus features a multi-purpose building, a library, a cafeteria, a laboratory building, a gymnasium, and 10 dormitory buildings, with a capacity for 18,000 students and faculty members. The campus has installed 42 units of the 20HP–40HP “Zhiku A” heat pump air conditioning system, with duct-type and ceiling-mounted units serving as terminal equipment, providing heating and cooling coverage for an area of 20,000 square meters.

View details

05

Guangzhou Technician College, Guangdong Province

Located at No. 88 Keji Avenue, Zengcheng District, Guangzhou, the college covers a total area of 484.66 mu and comprises three campuses. It has installed a total of 28 Daoduolian “Zhiku A” series units with capacities of 16, 18, 32, and 36 HP, providing a total cooling capacity of 2,500 kW.

View details

06

Guiyang No. 6 High School, Baiyun Campus

The campus covers an area of 170,800 square meters, with a total floor area of 135,000 square meters, and can accommodate 3,600 students. The project required an investment of approximately 1.07 billion yuan. The school installed 44 units of the “Zhiku A” commercial multi-split air conditioning system, with a total cooling capacity of 1,500 BTU.

View details

07

Renovation of Huidongfang Hospital in Huizhou (Phase I)

Located in Biji Village, Pinghai Town, Huidong County, Huizhou City, this facility was constructed as a temporary emergency medical center. Outes actively participated in the renovation project, installing a total of 35 24-horsepower “Zhiku A” multi-split systems.

View details

08

Quzhou Field Hospital

Located at Donggang 3rd Road, Quzhou Smart Manufacturing New Town; equipped with 128 units of the Outes GRD-36DW/BBP-N3, 56 units of the GRD-51DW/BBP-N3, 50 units of the GRD-72DW/B-N3R, and 19 units of the GRD-120DW/BGS-N3

View details

09

Office of the Guangzhou Housing Provident Fund Management Center, Guangdong Province

Located at Sanyin Building, Tianhe District, Guangzhou, Guangdong Province, featuring 9 sets of Zhiku A-Series multi-split systems with 84 indoor units

View details

010

Xingwen County High-Speed Rail New District People's Hospital

Located in Xingwen County, Yibin City, Sichuan Province, the project covers a total area of over 110 mu and utilizes a total of 51 Zhiku A-series outdoor units and 445 indoor units.

View details

011

National Defense Education Training Base, Yunfu City, Guangdong Province

Located on Xiushan Road in the Lishui Economic Development Zone, the school has a total floor area of approximately 194,000 square meters. Zhongguang Outes has equipped 60,000 square meters of this space with 46 42-HP heat pump multi-split air conditioning units, 4 heat pump rooftop air conditioning units, and 3 modular units.

View details
< 1 >
图片名称

Waiting for Your Note

Submit